Defense
Defense Program. Hydraulic Jack Shelters.
Advanced containerized shelters with integrated hydraulic jack systems for rapid, self-levelling deployment on uneven terrain — engineered for forward-operating installations where site prep is not an option.
Programme scale
Defence programme, multi-unit
Timeline
12 weeks per unit
Active since
2022 – 2025
The challenge
What made this hard.
- Level a 4-tonne shelter on uneven ground in under 15 minutes.
- Survive repeated jack cycles without frame fatigue.
- Retain full IP54 sealing after every jack extension.
- Fit within standard ISO container envelope for logistics.
The solution
How PES built it.
- Four synchronised hydraulic jacks driven from a shelter-mounted power pack.
- Reinforced corner posts and full-length structural spine.
- Bellows-sealed jack apertures maintain interior IP rating.
- In-house hydraulic assembly and pressure testing on every unit.
Outcomes
Numbers the customer measures us on.
12 min
Level from cold
Four synchronised jacks, single-operator setup.
IP54
Retained sealing
Bellows-sealed jack apertures survive extension cycles.
ISO
Container envelope
Fits standard 20-ft ISO handling equipment.
Specifications
The technical envelope.
Envelope Size
6.06 × 2.44 × 2.59 m (ISO 20-ft)
Jack Stroke
600 mm each corner
Jack Capacity
5 tonnes / corner
Hydraulic System
Shelter-mounted power pack
Level Range
Up to 15° ground incline
Deployment Time
≤15 minutes
Materials
Built from
Structural steelHigh-tensile plateHydraulic-grade rams
Finishes
Finished with
Hot-dip galvanisingMarine-grade paint
Gallery
From the production floor.
Process
From drawing to delivery.
- 01
Structural design and FEA on jack loading
- 02
Heavy-plate laser cutting and forming
- 03
Full-perimeter welding with WPS-controlled joints
- 04
Hydraulic assembly and pressure test
- 05
Sealing, painting and commissioning
Machines used
The tools that built it
Capabilities engaged
Disciplines applied
Related work
More from the portfolio.
Start your programme
Bring your drawing.
We'll quote in 24 hours.
Whether you need one prototype or a nationwide rollout, our engineering team responds within one working day with a full technical proposal.
Next project
MCB Cabins (EMP Proof) with RFI Doors