Precision Engineering Services
Calibrating000
Skip to main content
Defense

Defense Program. Hydraulic Jack Shelters.

Advanced containerized shelters with integrated hydraulic jack systems for rapid, self-levelling deployment on uneven terrain — engineered for forward-operating installations where site prep is not an option.

Programme scale
Defence programme, multi-unit
Timeline
12 weeks per unit
Active since
2022 – 2025
The challenge

What made this hard.

  • Level a 4-tonne shelter on uneven ground in under 15 minutes.
  • Survive repeated jack cycles without frame fatigue.
  • Retain full IP54 sealing after every jack extension.
  • Fit within standard ISO container envelope for logistics.
The solution

How PES built it.

  • Four synchronised hydraulic jacks driven from a shelter-mounted power pack.
  • Reinforced corner posts and full-length structural spine.
  • Bellows-sealed jack apertures maintain interior IP rating.
  • In-house hydraulic assembly and pressure testing on every unit.
Outcomes

Numbers the customer measures us on.

12 min
Level from cold

Four synchronised jacks, single-operator setup.

IP54
Retained sealing

Bellows-sealed jack apertures survive extension cycles.

ISO
Container envelope

Fits standard 20-ft ISO handling equipment.

Specifications

The technical envelope.

Envelope Size
6.06 × 2.44 × 2.59 m (ISO 20-ft)
Jack Stroke
600 mm each corner
Jack Capacity
5 tonnes / corner
Hydraulic System
Shelter-mounted power pack
Level Range
Up to 15° ground incline
Deployment Time
≤15 minutes
Materials

Built from

Structural steelHigh-tensile plateHydraulic-grade rams
Finishes

Finished with

Hot-dip galvanisingMarine-grade paint
Gallery

From the production floor.

Process

From drawing to delivery.

  1. 01

    Structural design and FEA on jack loading

  2. 02

    Heavy-plate laser cutting and forming

  3. 03

    Full-perimeter welding with WPS-controlled joints

  4. 04

    Hydraulic assembly and pressure test

  5. 05

    Sealing, painting and commissioning

FAQ

Questions we hear most.

Have another? Ask our engineering team.

Start your programme

Bring your drawing.
We'll quote in 24 hours.

Whether you need one prototype or a nationwide rollout, our engineering team responds within one working day with a full technical proposal.

Next project
MCB Cabins (EMP Proof) with RFI Doors
Telecom & Defense
View project